Contractor-ready scope

Contractor Quote Prep Kit

Turn a rough project idea into a clear scope, photo set, measurement list, and bid comparison sheet before you ask contractors for numbers.

Scope Brief Builder

Fill the brief once, then send the same scope to every contractor so bids are easier to compare.

Auto-saves in this browserProject notes stay on this device unless you copy, download, email, or submit a checklist request.
Brief readiness--/100
Add project details

BeforeQuote will show whether this scope brief has enough city, scope, access, and evidence detail to send to contractors.

todo
Local city

Choose the closest city in the header.

todo
Scope and condition

Add measurable scope and current condition notes.

todo
Project assumptions

Keep project-specific assumptions selected.

todo
Property access

Confirm access, rules, and working limits.

todo
Photos and measurements

Collect project photos and measurements.

todo
Planning range

Run a calculator or paste the range you want to sanity-check.

Next steps
    Hiring readiness gate

    Build a contractor-ready plan

    BeforeQuote will show whether the project is ready for outreach, bid comparison, or final contract review.

    --/100
    todoContact contractors

    Finish the brief before sending it widely.

    todoCompare bids

    Collect at least two written, comparable bids.

    todoPre-signing check

    Verify contract basics before choosing a contractor.

    Brief --/100Range --/100Allowances --/100Agenda --/100Approval --/100Permit/access --/100Contacts 0/3Strong walkthroughs 0/3Comparable bids 0/2Contractor basics 0/8
    Blocking items
    • Fill the scope brief to see the next blockers.
    Must include
    Project-specific scope to confirm
    Project photos and measurements to collect
    Photos
    Measurements
    Permit, schedule, and cost risks to ask about
    Access and rules
    Photos and measurements

    Contractor-ready brief

    Copy this into an email, text, or notes app.

    --/100

    Fill the scope brief to see what to send first, what to bring to the walkthrough, and what to wait for before signing.

    Send first
      Walkthrough
        Before signing

          BeforeQuote will show whether this range is useful for outreach, or only safe as an early budget anchor.

          --/100
          todoEvidence

          Add project details to test the planning range.

          todoEvidence

          Add project details to test the planning range.

          todoEvidence

          Add project details to test the planning range.

          todoEvidence

          Add project details to test the planning range.

          todoEvidence

          Add project details to test the planning range.

          Turn vague material, fixture, equipment, finish, and owner-supplied assumptions into written contractor questions.

          --/100

          Ask how this item is priced, selected, substituted, and approved before comparing totals.

          Ask how this item is priced, selected, substituted, and approved before comparing totals.

          Ask how this item is priced, selected, substituted, and approved before comparing totals.

          Ask how this item is priced, selected, substituted, and approved before comparing totals.

          BeforeQuote will turn the scope, range, allowance, access, and risk context into a contractor walkthrough agenda.

          --/100
          todoAgenda signal

          Add project details to build the walkthrough agenda.

          todoAgenda signal

          Add project details to build the walkthrough agenda.

          todoAgenda signal

          Add project details to build the walkthrough agenda.

          todoAgenda signal

          Add project details to build the walkthrough agenda.

          Choose a city in the header to see the local factors contractors may price into the bid.

            One local file with the brief, message, access packet, contractor screener, timeline, outreach, walkthrough, and bid follow-up notes.

            Generated locally in your browser. Copying or downloading this packet does not upload your project notes.

            1. Capture the work area

            Photos reduce back-and-forth and help contractors decide whether the project needs an inspection, specialty trade, permit, access plan, or allowance before they quote.

            • One wide photo of each room, elevation, or work area.
            • Close-ups of damage, stains, cracks, leaks, rot, uneven surfaces, or old fixtures.
            • Access photos: driveway, stairs, elevator, attic, crawlspace, roof edge, utility room, or fence line.
            • Measurement photos with a tape measure visible for walls, rooms, cabinets, trim, fence runs, or deck spans.
            • Existing material labels, paint cans, appliance plates, HVAC model numbers, or fixture brands when available.

            2. Measure the assumptions that price the job

            Area projects

            Measure rooms, wall area, ceiling height, flooring area, roof footprint, deck size, or fence length.

            Scope projects

            List fixtures, cabinets, appliances, doors, trim, vents, outlets, plumbing points, or HVAC equipment.

            Condition notes

            Note damage, moisture, old paint, rot, code issues, access limits, HOA rules, or working-hour limits.

            3. Ask every contractor the same questions

            • What exactly is included in this price, and what is excluded?
            • Which material line, brand, finish, or equipment model is assumed?
            • What conditions could change the price after inspection or demo?
            • Who handles permits, disposal, cleanup, protection, and final touch-ups?
            • How are change orders priced and approved?
            • What deposit, payment schedule, insurance, license, and warranty apply?

            4. Prepare the permit and access packet

            Before booking walkthroughs, collect the property rules that can change price, schedule, insurance, and whether a bid is comparable.

            Packet readiness--/100

            Add access basics

            Most likely blockersPermit and access rules will appear here.

            Choose a project, home type, and city in the scope builder.

            5. Screen contractors before booking a walkthrough

            Use this short script before spending time on a site visit or treating a contractor as a real option.

            6. Build a contractor shortlist before outreach

            Check whether you have two or three real local options before one fast reply starts feeling like the market.

            Shortlist readiness--/100

            Build the shortlist first

            Next screenFind two viable options

            BeforeQuote will flag whether the candidate set is strong enough for outreach.

            Confirm project fit, service area, timing, and written-proof willingness before outreach.

            Confirm project fit, service area, timing, and written-proof willingness before outreach.

            Confirm project fit, service area, timing, and written-proof willingness before outreach.

            7. Plan the 1-8 week hiring timeline

            Use the same scope, city, property context, and signing gate from today through final bid comparison.

            Current stageTighten the scope first

            BeforeQuote will update this as the brief, outreach tracker, and bid follow-up rows change.

            Signing gateDo not sign yet

            Written scope, comparable bids, and contractor basics must be clear before signing.

            Next actionsBuild the plan first
            Today
              Days 1-3
                Days 3-10
                  Days 7-21
                    Before signing

                      8. Check the evidence before trusting the next step

                      See which parts of the quote decision are supported by actual scope, reply, walkthrough, bid, and contractor proof.

                      Evidence strength--/100

                      Build the evidence record

                      Most useful next proofFill the scope brief first

                      BeforeQuote will show what evidence is strong enough for outreach, bid comparison, or pre-signing review.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      todoEvidence

                      Add project details to see this evidence signal.

                      9. Track contractor outreach before bids arrive

                      Use one scope brief for three contractors, then track who needs a follow-up, walkthrough, or quote check.

                      Send the same scope brief and ask what else they need to price it cleanly.

                      Send the same scope brief and ask what else they need to price it cleanly.

                      Send the same scope brief and ask what else they need to price it cleanly.

                      10. Evaluate contractor replies before booking time

                      Paste or summarize a reply, mark what it actually answered, and turn weak replies into written follow-up questions.

                      Reply quality--/100

                      Paste a reply to evaluate it

                      BeforeQuote will look for fit, walkthrough timing, written-bid date, scope assumptions, access risks, and contract basics.
                      Answered
                        Ask next

                          Raw reply text is processed locally. Analytics events only include score and gap counts, not the reply text.

                          11. Score walkthroughs before waiting for bids

                          After each site visit, record whether the contractor inspected the job well enough to produce a useful written bid.

                          Walkthrough 1Add visit status and observations
                          --/100
                          Walkthrough 2Add visit status and observations
                          --/100
                          Walkthrough 3Add visit status and observations
                          --/100

                          Rough estimates use the currency for your selected city.

                          12. Vet the contractor basics before comparing price

                          Mark what the contractor has already documented. BeforeQuote will generate the missing verification questions.

                          License / registration

                          Counts as proof: A license or registration number, issuing authority, trade category, and business name that match the contractor or company bidding the work.

                          Weak signal: A verbal "we are licensed" answer, a number without the issuing authority, or a license that belongs to an unrelated business.

                          Insurance certificate

                          Counts as proof: A current certificate of insurance naming the insured business, coverage type, policy dates, and any building or property-manager requirements.

                          Weak signal: A badge on a website, an expired certificate, or a generic statement that insurance exists without coverage dates or business name.

                          Written scope

                          Counts as proof: A written quote or proposal that names the rooms, surfaces, fixtures, materials, allowances, prep/demo, cleanup, exclusions, and assumptions.

                          Weak signal: A single total with "labor and materials" only, or a text message that does not say what is included or excluded.

                          Payment schedule

                          Counts as proof: Deposit amount, payment milestones, final payment trigger, accepted methods, and what must be complete before each payment.

                          Weak signal: "Pay as we go," "most upfront," or a large deposit request without milestones, completion criteria, or refund/cancellation terms.

                          Change-order process

                          Counts as proof: A written rule that extra work requires homeowner approval before work starts, with pricing method, documentation, and who can approve it.

                          Weak signal: Verbal approval, after-the-fact billing, or "we will figure it out onsite" without unit rates or written approval steps.

                          Warranty terms

                          Counts as proof: Written labor warranty length, material warranty handling, exclusions, callback process, and whether warranty transfers if the home is sold.

                          Weak signal: "We stand behind our work" without duration, exclusions, response process, or distinction between labor and material warranty.

                          Permit responsibility

                          Counts as proof: A written permit decision, who pulls the permit, who pays fees, inspection responsibility, schedule impact, and final closeout documents.

                          Weak signal: "No permit needed" without project-specific reasoning, or assuming the homeowner handles permits without saying so in the bid.

                          Start date / duration

                          Counts as proof: Written start window, expected duration, crew days/hours, access needs, cleanup plan, delay terms, and punch-list or closeout expectations.

                          Weak signal: "We can start soon" or "about a week" without start window, daily access requirements, delay handling, or completion criteria.

                          13. Compare bids by assumptions, not just total price

                          Enter contractor totals and mark which written details are included. BeforeQuote will generate follow-up questions.

                          What makes contractor bids comparable?

                          Use these standards before asking for revised totals, especially when one bid is a vague lump sum.

                          Same written scope

                          Comparable when: Each bid names the same rooms, surfaces, fixtures, demolition, prep, cleanup, exclusions, and assumptions.

                          Weak signal: One bid is a lump sum while another lists detailed inclusions, exclusions, or site assumptions.

                          Material and allowance parity

                          Comparable when: Allowances, product lines, quantities, finish level, owner-supplied items, and substitution rules are written down.

                          Weak signal: One contractor assumes builder-grade materials while another assumes premium fixtures, tile, cabinets, paint, or equipment.

                          Access, permit, and disposal responsibility

                          Comparable when: Permit decision, inspection responsibility, parking/loading, HOA or building access, protection, dumpster, and disposal are assigned.

                          Weak signal: Permit, access, cleanup, disposal, elevator booking, or property-manager requirements are handled verbally or left for later.

                          Timeline and start window

                          Comparable when: Start window, expected duration, crew days/hours, lead times, delay handling, and completion or punch-list expectations are written.

                          Weak signal: The bid says "soon," "about a week," or gives only a verbal schedule without lead-time or delay terms.

                          Warranty, cleanup, and closeout

                          Comparable when: Labor warranty, material warranty handling, exclusions, cleanup, punch list, inspection closeout, and callback process are included.

                          Weak signal: The contractor says they stand behind the work, but warranty duration, exclusions, cleanup, or callbacks are not written.

                          Payment and change-order terms

                          Comparable when: Deposit, progress payments, final payment trigger, accepted methods, and written change-order approval before extra work are clear.

                          Weak signal: Most money is due upfront, change orders are verbal, or extra work can be billed after the fact without written approval.

                          Amounts use the currency for your selected city.

                          14. Review signing risk before choosing a contractor

                          Use the evidence already entered in this kit to see what must be written before a homeowner signs.

                          Signing risk--/100

                          Build the evidence first

                          Most important blockerComparable written bids and contractor basics will appear here.

                          BeforeQuote will summarize incomplete bid assumptions, missing contractor proof, access rules, and schedule pressure.

                          Do not sign until
                            Ask next
                              Keep with final quote
                                Evidence basis

                                  Generated locally from the kit. Analytics only receives risk score and counts, not bid text, project packet, or contractor replies.

                                  15. Ask the finalist for written proof

                                  Turn the signing-risk gaps into a short request a homeowner can send before treating a contractor as the final choice.

                                  Request focusBuild the evidence first

                                  BeforeQuote will use missing bid assumptions, contractor basics, permit/access checks, reply quality, and schedule pressure.

                                  Proof to request

                                    Generated locally from the kit. Analytics only receives request counts and scores, not the generated message, bid text, contractor replies, or project packet.

                                    Bid red flags

                                    • A bid is much lower but does not list prep, disposal, permits, or material assumptions.
                                    • The contractor will not separate labor, materials, allowances, or optional scope.
                                    • The quote depends on verbal promises that are not written into the scope.
                                    • Payment terms require most of the money before work or materials arrive.
                                    Use the matching BeforeQuote calculator first, then bring this prep kit to the quote conversation. The goal is not to force one exact price. It is to make every bid easier to compare.